Project : GC21107300 ENGINEERING, PROCUREMENT,
INSTALLATION AND COMMISSIONING (EPIC) OF NEW
EFFLUENT WATER TREATMENT PLANT FOR NGL AT
MESAIEED
Client : QatarEnergy
Year of Commencement : July 2022
Schedule of Completion : November 2025
Location : Mesiaeed, Qatar
Role : Prime EPC Contractor
Project Objective:
QatarEnergy (QP) owns and operates four (4) NGL (Natural Gas
Liquid) Plants at Mesaieed NGL Complex. These NGL plants generates
process and surface run off effluent wastewater. Currently, there are no
wastewater treatment facilities in NGL 1/ 2 Plants. NGL 3/ 4 Plants
have minimum treatment facilities, and the treated wastewater is routed
to sea.
The PROJECT intends to install a New Effluent Water Treatment Plant
(NEWTP) for NGL Complex, including upgradation of existing collection
system in NGL plants to treat the effluents generated in NGL complex
and re use the treated water for irrigation to meet MME requirements