Epic For Gas Supply To Facility D At Al Wakrah (Phase-2)
Epic For Gas Supply To Facility D At Al Wakrah (Phase-2)
A new 36 inch buried and bunded pipeline, approximately 31 km long from Station T1 up to Station W5
Approx 200 m new 30-inch buried and bunded pipeline for tie-in to the existing incoming gas supply pipelines from Station 72-SBV-31 to Station T1 upstream of the filter-separators.
A new tie-in shall be made on the SGTP-P1 pipeline by hot tapping ( Barred tee with plug O Ring) the 36-inch SGTP-P1 pipeline
A valve station shall also be installed at this new SGTP-P1 tie-in point with a special Barred-Tee, a pit and an MOV
Title : EPIC FOR GAS SUPPLY TO FACILITY D AT AL WAKRAH (PHASE-2)
Contract Number : GC16105400
Duration : 30 Months
Location : Ras Laffan
Effective Date : January 2017
Client : Qatar Petroleum
Main Contractor : Medgulf Construction Company W.L.L