Epic For Gas Supply To Facility D At Al Wakrah (Phase-2)

Epic For Gas Supply To Facility D At Al Wakrah (Phase-2)

  • A new 36 inch buried and bunded pipeline, approximately 31 km long from Station T1 up to Station W5
  • Approx 200 m new 30-inch buried and bunded pipeline for tie-in to the existing incoming gas supply pipelines from Station 72-SBV-31 to Station T1 upstream of the filter-separators.
  • A new tie-in shall be made on the SGTP-P1 pipeline by hot tapping ( Barred tee with plug O Ring) the 36-inch SGTP-P1 pipeline
  • A valve station shall also be installed at this new SGTP-P1 tie-in point with a special Barred-Tee, a pit and an MOV

Title : EPIC FOR GAS SUPPLY TO FACILITY D AT AL WAKRAH (PHASE-2)

Contract Number : GC16105400

Duration : 30 Months

Location : Ras Laffan

Effective Date : January 2017

Client : Qatar Petroleum

Main Contractor : Medgulf Construction Company W.L.L 