GC161058A0 EPIC OF METERING SYSTEM AT MESAIEED (PART A)
Design, procure, Install and commission Facility new Coriolis mass flow meter order to mitigate the discrepancies in the quantity of supply of butane through the current butane flow metering system installed in NGL and the quantity of butane received through the meter at QAFAC.. Scope:
CIVIL/STRUCTURAL
PIPING
ELECTRICAL
INSTRUMENTATION
LOSS PREVENTION HAZID Study
START DATE : 04th JANUARY 2017
END DATE : 06th JULY 2018