GC16105400 EPIC FOR GAS SUPPLY TO FACILITY D AT AL WAKRAH (PHASE-2)
  1. A new thirty one ( 31 ) Kilometers of 36 inch buried and bunded pipeline, long from Station T1 up to Station W5.
  2. Approx 200 m new 30-inch buried and bunded pipeline for tie-in to the existing incoming gas supply pipelines from Station 72-SBV-31 to Station T1 upstream of the filter-separators.
  3. A new tie-in shall be made on the SGTP-P1 pipeline by hot tapping ( Barred tee with plug O Ring) the 36-inch SGTP-P1 pipeline
  4. A valve station shall also be installed at this new SGTP-P1 tie-in point
START DATE : JANUARY 2017