SAIPEM / Qatar Energy LNG

SAIPEM / Qatar Energy LNG

CONSTRUCTION OF ONSHORE 32 INCH PIPELINE PROJECT IN RASLAFFAN- CONSTRUCTION WORKS Scope of Works:
  1. Construction of Approximately 5 Kilometres x 2 no. of 32” Carbon Steel ( CRA ) Pipelines from LTE to Barzan Plant including
    • Fabrication of Temporary Supports
    • Onshore Trench Excavation from LTE to Barzan Plant
    • Sand bedding under the Pipeline
    • 32 “ Pipeline Transportation, Stringing along the ROW
    • Assistance for 32’’ CRA Welding
  2. Construction of 10 kilometres of 4.5 “ MEG & CI Pipeline Installation, Welding, NDT
  3. Micro tunnelling Works for Crossings- 3 No.
  4. Installation of Cathodic Protection System
  5. FO Cable and LV Cable Laying in the trench – 6 Kilometres
  6. Construction of Beach Valve Vault, Anchor Block
  7. Fencing Works around Beach Valve Station
  8. Installation of beach Valves
  9. Installation of Chemical Injection System Inside the Plant
  10. Pre-Commissioning, Purging & preservation of 32” & 4.5” Pipelines
START DATE : AUGUST 2018