Structural Works At Metro Station Rtc/042/2012 – Design And Build Package 5 – Major Stations – Doha Metro
Structural Works At Metro Station Rtc/042/2012 – Design And Build Package 5 – Major Stations – Doha Metro
The project includes structural concrete works at Msheireb including all required labour, supervision, management and tools for the structural , installation/erection of all required formwork (false work, supports, shoring), installation of all required steel reinforcement as per approved Bar Bending Schedule (BBS) and shop drawings, all labour and tools required for concrete casting and curing, to slabs, walls, columns, concourse, roof, platform and miscellaneous areas.
Contract Number : Qatar Integrated Railway Projects, Major Stations – Structural Works